01/05/2026
π Location: Burpengary East
π Area: 33.5 sqm β Double Garage
π Condition:
At first glance, the slab looked like a typical garage in decent condition.
However, after grinding, significant damage was revealed across the surface. This required extensive patching before continuing, around 6 times more than what would normally be expected for a garage of this size.
π§ System Installed:
β’ DF Steel Large Flake
β’ N35 Base Colour
β’ Polyurethane Top Coat
β’ Full Flake System β Professionally Installed
β¨ Result:
A complete recovery of a heavily compromised slab, brought back to a clean, consistent and durable finish.
Despite intermittent rain and changing weather conditions, the job was completed successfully with full control of the process.
Another example of why proper preparation makes all the difference.
β
Extensive surface repairs completed
β
Uniform full flake finish
β
Durable and easy-to-clean system
β
Built for long-term performance