29/03/2026
Why won't we produce construction drawings from architectural plans alone?
Because walls move. Framing settles.
Dimensions on paper and dimensions on site are rarely the same. Sometimes by 20mm. Once, by 1500mm.
Our rule is absolute: our Draftsperson physically measures standing walls on site before any construction drawings are produced. Until then, we work with 3D concept images and sketch layouts only.
It prevents costly rework. It protects the client's investment. And it's one of the reasons our installs fit precisely every time.
8489 1152 · Link in bio