01/05/2026
Our latest project is excavating to widen the driveway, 55 tonnes of dirt excavated so far. There's a 2m wide set of stairs going to the space left. There also another retaining wall in the middle of the front yard. And then there's the back yard to start after this. Wall post are in 1600mm , the wall is a 1m tall. The ladt thing we'll do is pour the new drive.