26/10/2026
[𝐂𝐨𝐦𝐩𝐥𝐞𝐭𝐞𝐝 𝐏𝐫𝐨𝐣𝐞𝐜𝐭: 𝐌𝐚𝐣𝐨𝐫 𝐂𝐨𝐫𝐩𝐨𝐫𝐚𝐭𝐞 𝐋𝐚𝐰 𝐅𝐢𝐫𝐦 | 𝐌𝐞𝐥𝐛𝐨𝐮𝐫𝐧𝐞 𝐂𝐁𝐃]
Caterlink delivered a commercial kitchen and front-of-house café fit-out for major corporate law firm’s workplace in Melbourne’s C*D.
Appointed through a tender process, Caterlink was selected based on successful collaboration with the builder on previous projects and its ability to meet tight schedules.
Delivered over six months, the project required detailed planning and coordination across consultation, project management, equipment supply, installation and final fit-out.
𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐒𝐂𝐎𝐏𝐄
Caterlink provided:
• Consultation
• Project management
• Commercial kitchen equipment supply and installation
• Back-of-house preparation areas
• Back-of-house cooking areas
• Back-of-house refrigeration
• Front-of-house preparation areas
• Front-of-house display areas
• Front-of-house café
𝐄𝐐𝐔𝐈𝐏𝐌𝐄𝐍𝐓 𝐒𝐔𝐏𝐏𝐋𝐈𝐄𝐃
Major equipment brands included:
• MKN Global cooking equipment supplied by Phoeniks.
• Rational Australia cooking equipment supplied by Comcater
• Scotsman Ice Systems ice machine
• Hoshizaki Lancer Group ice machine
• CyberChill Refrigeration
• ecocanopy Australia ventilation
• MEIKO - The clean solution dishwashing equipment
The equipment package was selected to support food preparation, cooking, refrigeration, beverage service and warewashing across the back-of-house kitchen and front-of-house café.
𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐂𝐇𝐀𝐋𝐋𝐄𝐍𝐆𝐄
Working within a Melbourne C*D skyscraper presented several logistical constraints. Restrictions on noisy work, delivery times and site access limited the available windows for installation.
Caterlink coordinated equipment deliveries and installation with the project team to keep its work aligned with the construction schedule.
𝐓𝐇𝐄 𝐑𝐄𝐒𝐔𝐋𝐓
The completed project provided an integrated commercial kitchen and café environment designed for the demands of a corporate workplace.
Despite the access and scheduling constraints, Caterlink completed its scope within the six-month project period. The result brings together coordinated back-of-house production areas, front-of-house preparation and display, refrigeration, ventilation and warewashing systems in one functional operation.
𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐓𝐄𝐀𝐌
Designer: Sangster Design Group
Architect: Hassell
Builder: Buildcorp
Caterlink Project Manager: Johnny Mikhael Nar
Caterlink Project and Sales Consultant: Ashi De Alwis