01/18/2025
Here is a house that we just completed. Weeks of just cleaning before anything could be painted. Thick mold everywhere. All HRV vents were closed or blocked. The range hood vent was disconnected and all cooking grease stayed inside the property. Nearly everything had to be replaced. Holes in the drywall everywhere. Hand rails and balusters destroyed. Carpet and flooring - destroyed. In the end, after many hours of plastering and sanding, we applied three coats of primer to everything. Two coats of color and cut in. Two coats on most trim but the ceilings and crown required seven (7) - yes seven!! coats of stain blocker, primer and ceiling paint to finally get back to white! Eleven (11) truck loads of garbage was taken to Robin Hood Bay. The deck was pressure washed. We installed all new light fixtures, appliances, countertops, sinks, faucets, toilets, shower head and fixed various plumbing issues. Repaired handrails and added new aluminum balusters. New carpet on the stairs. New exterior doors. Hard to believe it’s the same house. Standby for the “after” photos.