05/29/2026
Ran into a snag on this pump pull out in Langley. There was over 20’ of excess rope float at the static water level that got wedged up against an over expanded torque arrestor. Whoever did this install many years ago didn’t do it right and the result was this pump was very close to getting stuck and causing a very expensive problem. Luckily was some intuition, quick thinking and having the right tools we were still able to get the 21 homes on this communal well water the same day.