05/10/2023
A big job that lasted a couple months, complete gut of the entire house, in stages as per the building owners request.
- 4 layers on all the walls plus the wooden lats and insulation to be ripped out
- De nailed all the original 2x4's
- Ripped out all the old plumbing
- Installed all new 1/4 and 1/2 inch PEX tubing for all the sinks and showers plus washer and dryer / dishwasher
- Installed all new ABS for drains to all the showers and toilets etc..
- Installed new doors
Big job we had lots of fun at, so much work needed to be done.