02/01/2022
Well.. Materials finally showed up today (Monday) so after doing some Roof Top Snow Removal the crew and I headed back to the basement and hauled ass to finish it off (for now anyways till they run the ducting and plumbing to the main floor) as the builder and home owner are doing a walk through tomorrow (Tuesday) at 9am.
Layout consists of the following:
- Gym
- Office Area
- Bar/Games Area
- Living Room Space
- Bedroom
- Bathroom
- Mech/Storage Room
- Walk In Closet
- 3 Linen Closets
- Storage Area under the stairs
- Fire Place Mantle
Needless to say this is 1 big basement.. 2304sqft to he exact which is bigger then some peoples homes.
So heres the updated photos untill we go back to do some bulkheads once the run their ducting and plumbing.
K&S Construction
204-770-1265
Big Thanks to my crew who busted there ass and worked untill 1am with me.