31/10/2025
Another big job is coming to an end. I just need to lay new flooring in the office space, fit a new door leading to the bathrooms and sliding doors in the office space then it will be a wrap.
No job to big or small so message or call today on 07961 266719to book your free quote on all home and gardening jobs. I have a few bookings left before the big day SANTA IS COMING PEOPLE.
Here are the jobs completed by me.
Kitchen
- Built new stud wall to make way for a new bathroom door and to make the new bathroom bigger.
- Plaster boarded new stud wall on both sides and fitted a new door frame and door.
- Moved and installed a new drain for the kitchen sink.
- Fitted new worktop, sink and electrical tap.
- Painted walls and ceiling with Valspar simplicity interior matt.
- Finished off painting all wood work with walnut wood stain.
Bathroom 1 and 2
- Built a new stud wall for new access to bathroom two.
- Built a dividing wall between bathroom one and two.
- Plaster boarded and prepared all new walls ready for painting.
- Installed new drainage and water feeds for new toilets, sinks and new shower.
- Installed two toilets and two sinks with electrical taps along with vanity units in both. Boxed off the ends with new panels
- Installed a new shower tray and shower in bathroom two.
- Tilled around the sink in the bathroom one, tilled around the sink and toilet in bathroom two and tilled the whole shower area.
- Painted all walls and ceilings with valspar interior matt.
- Fitted new door and door frame in bathroom two.
- Fitted new skirting boards throughout both bathrooms.
- Painted all woodwork with walnut wood stain.
- Finished off with new lino flooring in both bathrooms.
Office space
- Built new stud wall to separate the new office space and garage.
- Removed stud wall in office space once the new wall was up to make office space bigger.
- Removed the second stud wall in office space to make way for new sliding doors.
- Plaster boarded and prepared new stud walls and half finished walls where old doors where in the past. 1 side was already done before i started
- Built new floor frame and laid new floor boards where i extended the office space.
- Fitted new skirting boards throughout office space.
- Fitted new door frame and door leading from the office to the garage space.
- Painted all walls and ceiling with valspar interior matt apart from 1 wall which got painted with Johnson's shadow grey.
- All wood work painted with Johnson`s quick drying gloss.
Electric cable got connected to the metre leading to the shower got installed by a 3rd party.
What a job this has been and what a difference it is now to when i first started. No job is too big or small