03/08/2025
It’s been a very busy time recently with work as well as expecting our first child in October, Facebook has been the last thing on my mind. Here is a photo dump of some of the things I’ve been up to with much more to follow in the coming days to get myself back up to speed with posting.
This is evidence of how work can snow ball into bigger things once you’ve earned the trust and shown your capabilities.
A starting job of tiling a lounge and hallway floor, turned into;
- Renovating an old warnout bathroom to a modern & fresh shower room.
- Framing, insulating, boarding with acoustic plasterboard, taping and jointing, sanding, cleaning and painting of all ground floor ceilings to help reduce sound transference from upstairs.
- An old patio removed and replaced with natural 60 x 40 travertine tiles with a low level wall capped with travertine for a new space for the clients log burning hot tub.
- Constructing and fitting an electric gate.
- Fitting new wooden cladding for a log storage area doubling up as a fence for solar panels.
And so much more.
A massive thank you to Arrann & Teri for your complete trust whilst the projects were underway.