11/12/2025
Commissioned a newly installed Advanced/Hochiki 45-point fire detection system in Bathgate today, integrating it into an existing 10-panel network. The installation included VESDA for early detection within the motor control panels, along with three zone monitors interfaced through galvanic barriers to provide protection for the site’s intrinsically safe areas.