The only video we managed to capture from this project 👌
A full refresh throughout on this one, starting with overboarding all the ceilings due to the existing Artex and the risk of distemper causing issues later down the line. Once boarded, everything was fully skimmed for a fresh modern finish.
We also patched in new socket positions throughout the property and carried out a full reskim in both the kitchen and lounge area after parts had been ripped out, leaving us working over a mix of different backgrounds along with damaged plaster where old tiles had been removed. Plenty of prep work went into getting everything back to a solid standard.
A lovely change requested by the customer was opening up the kitchen and lounge area by removing the existing frame and plastering it all back in cleanly for a much neater, more open-plan feel throughout the home.
A lot of work went into this one, but the end result was well worth it. Another happy customer 👍