17/05/2026
A recently completed three-storey office block project in Lisburn.
The existing aluminium frames had become faded and weathered over time, with extensive flaking paint and corrosion beneath the surface. Significant preparation work was required, including hours of scraping and sanding.
The completed transformation has given the building a far more modern and professional appearance, perfectly complementing the businesses inside.
WhatsApp 📲 07850298906
Email 📧 [email protected]
or message for a free no obligation quote.
--------‐------‐-------------------------------------------------------------
Almost any colour available, including colour matching.
All old silicone sealant removed before spraying, then resealed in colour matched sealant.
Handle and letterbox replacement packages.
Window hinges and mechanisms replaced if required, fix those drafty windows 🥶
Failed units/misted up glass can be replaced.
£££ Massive savings on new £££ No need to replace!