08/02/2023
Stage 2 at abbey villa. Like before, again time was a factor not to mention the flooding, muck and glar that this area had. With approx 70 cubic meters of concrete needed, along with all the other factors, it was also important to know that the concrete could be supplied in quantity along with quality and in the time scale required. Once again northstone concrete never let us down. From to start to finish from the prep work, drainage and again thinking of the finish product. This side was left rougher as such with a champ finish due to the amount of wear and tear but more so, due to the amount of players traveling over it with boots on, a flat finish would have no grip in boots. Also a band around each section poured. Certainly a massive difference made . Once again thanks to abbey villa