A N DAVIS

A N DAVIS I can personally help you with your design, sales and fitting of your home improvements.

Small downstairs w/c stripped out and refreshed, new flooring, new wall tiles and new toilet.
10/05/2026

Small downstairs w/c stripped out and refreshed, new flooring, new wall tiles and new toilet.

Utility room to match a kitchen fitted a few months ago.
16/04/2026

Utility room to match a kitchen fitted a few months ago.

New oak fire door and frame fitted , nice bit of woodwork.
15/04/2026

New oak fire door and frame fitted , nice bit of woodwork.

Floating Laminate flooring replaced with a LVT glue down floor.
11/04/2026

Floating Laminate flooring replaced with a LVT glue down floor.

This is a staircase over 100 years old no plywood, no mdf, just timber, it was very squeaky and you could feel a bit of ...
11/04/2026

This is a staircase over 100 years old no plywood, no mdf, just timber, it was very squeaky and you could feel a bit of movement, surprisingly no glue blocks, I think having central heating over the last 30/40 years the timber had shrunk and any glue had dried out , extra timber battens glued and screwed sorted it out nicely .

Squeaky stairs That Move when you walk on them will not fix themselves , material cost are usually low and depending on...
11/04/2026

Squeaky stairs That Move when you walk on them will not fix themselves , material cost are usually low and depending on access ! most repairs to standard stairs can be completed in a day .This job was completed over two days.

Bath removed and basin & a shower tray with enclosure fitted and a  new smaller basin .
04/02/2026

Bath removed and basin & a shower tray with enclosure fitted and a new smaller basin .

A split shower tray that need to be replaced.
04/02/2026

A split shower tray that need to be replaced.

A wet room / walk in shower that stater leaking , so a shower tray and shower panels were added with a new  surface moun...
04/02/2026

A wet room / walk in shower that stater leaking , so a shower tray and shower panels were added with a new surface mounted shower valve and kit.

Loft hole made larger and ladders fitted . Part of the loft  a area of floor was fitted and a light 💡 added , electrical...
04/02/2026

Loft hole made larger and ladders fitted . Part of the loft a area of floor was fitted and a light 💡 added , electrical testing and electrical certification completed .

Address

631 Kings Road
Birmingham
B449HW

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 1pm

Telephone

+447956919099

Alerts

Be the first to know and let us send you an email when A N DAVIS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to A N DAVIS:

Share