Edward & Brooke

Edward & Brooke We provide many services including, tiling, bathroom design and installation, and plumbing, as well as a variety of jobs around the home.

All exterior woodwork painted in customer's favourite colours.A lot of preparation on this one but that results in a ver...
05/09/2024

All exterior woodwork painted in customer's favourite colours.
A lot of preparation on this one but that results in a very happy customer and a very solid finish.

Summerhouse and garden shed painted and varnished, ready for the winter!All window and door furniture, gutters and downc...
25/09/2023

Summerhouse and garden shed painted and varnished, ready for the winter!
All window and door furniture, gutters and downcomers were removed and refitted upon completion for that no mess professional finish.

Another garage storage problem solved on Longshore Village.Worktop fitted as requested and heavy duty garage shelving wa...
09/08/2023

Another garage storage problem solved on Longshore Village.
Worktop fitted as requested and heavy duty garage shelving wall mounted.

A little job but a big difference, the replacement of a shower and basin waste. Now the shower tray doesn't fill up with...
04/02/2020

A little job but a big difference, the replacement of a shower and basin waste. Now the shower tray doesn't fill up with water when you run the basin tap😁. Push fit fittings under floorboards are never a good idea. Solvent pipe is always the better choice.

A shower fitted today for a return customer. Comment or message us for a free estimate. πŸ™‚
19/01/2020

A shower fitted today for a return customer.
Comment or message us for a free estimate. πŸ™‚

Showers supplied and fitted.
07/01/2020

Showers supplied and fitted.

Valour dream electric fire. Fitted in place of an existing gas fire.All types of fireplaces supplied and fitted.
27/12/2019

Valour dream electric fire.
Fitted in place of an existing gas fire.
All types of fireplaces supplied and fitted.

These shower boards were installed incorrectly by another bathroom fitter, the gap was too large and the silicone was in...
21/12/2019

These shower boards were installed incorrectly by another bathroom fitter, the gap was too large and the silicone was inadequate. We removed the old silicone and used an absorbant granule system to draw out all the moisture.
It took 7 courses over 7 days to dry out. We resealed everything correctly and allowed 48 hours for silicone to cure.
Things aren't alway beyond salvaging, our customer was very grateful that we could make good instead of having to replace the boards.

Fortunately we are better at fixing broken shower trays than we are at documenting the process. The customer feared this...
19/12/2019

Fortunately we are better at fixing broken shower trays than we are at documenting the process. The customer feared this was beyond repair, we were able to carry out a solid repair, saving the customer a lot of upheaval and money.

All styles of radiators supplied and fitted.
18/12/2019

All styles of radiators supplied and fitted.

A three part aluminium drop down ladder fitted into an existing hatch on south shore.
13/12/2019

A three part aluminium drop down ladder fitted into an existing hatch on south shore.

Another garage storage solution done today, this time customized to accommodate tv/hi-fi in a soon to be home gym.Inbox ...
27/09/2019

Another garage storage solution done today, this time customized to accommodate tv/hi-fi in a soon to be home gym.
Inbox for free estimates.

Address

Blyth

Website

Alerts

Be the first to know and let us send you an email when Edward & Brooke posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share