11/05/2026
Full kitchen installation all complete in Brighton. Wall and door removed to give an open plan / breakfast bar seating. Rewired, plastered, all plumbing renewed with new wastes. Removal of radiator in dining room side with new radiator relocated in kitchen side. Solid oak work tops with brick bond pattern tiling on walls, we self level floor for new LVT plank flooring, with finishing touches of led lighting to ceiling and wall cupboards.
Already for customer to decorate.