Fab’s building maintenance

Fab’s building maintenance Domestic and commercial maintenance, painting and decorating, general handyman duties. fabsbuilding

Old radiator removed and new white one installed, feel free for a like and a share 😁👍
24/10/2023

Old radiator removed and new white one installed, feel free for a like and a share 😁👍

Before and after ceiling, walls and woodwork painting. Feel free for a like and a share 👍😁
23/10/2023

Before and after ceiling, walls and woodwork painting. Feel free for a like and a share 👍😁

Few chips in a bath tub repaired, fell free for a like and a share 👍😁
21/10/2023

Few chips in a bath tub repaired, fell free for a like and a share 👍😁

Little bathroom floor tile job, feel free for a like and a share 👍😁
19/10/2023

Little bathroom floor tile job, feel free for a like and a share 👍😁

Job from a while ago after tenant put his foot through the ceiling whilst in the loft 🙄 feel free for a like and a share...
18/10/2023

Job from a while ago after tenant put his foot through the ceiling whilst in the loft 🙄 feel free for a like and a share 👍😁

12/10/2023

Been shut out my business page so gonna have to set another one up 😡

New laminate kitchen floor, feel free for a like and a share 👍😁
06/04/2023

New laminate kitchen floor, feel free for a like and a share 👍😁

White one out, new shiny one in 😁 feel free for a like and a share 👍
05/04/2023

White one out, new shiny one in 😁 feel free for a like and a share 👍

Before and after garage door and frame, sanded and repainted. Feel free for a like and a share 👍😁
06/01/2023

Before and after garage door and frame, sanded and repainted. Feel free for a like and a share 👍😁

Before and after, 2x fire doors- 1 replaced, both painted and new signs. Window and doorways jet washed, doorways also p...
16/12/2022

Before and after, 2x fire doors- 1 replaced, both painted and new signs. Window and doorways jet washed, doorways also painted inside and out. Feel free for a like and a share 👍😁

Before/ during and after new kitchen. Rip out old kitchen, run new cables and pipes, plastered ceiling, tiling, painted ...
15/12/2022

Before/ during and after new kitchen. Rip out old kitchen, run new cables and pipes, plastered ceiling, tiling, painted ceiling/ walls and woodwork, new light track, layed flooring. Didn’t fit the kitchen but had to sort out lots of snags and issues from big company that did. Feel free for a like and a share 😁👍

Address

Brighton

Website

Alerts

Be the first to know and let us send you an email when Fab’s building maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fab’s building maintenance:

Share