03/06/2026
Battling the weather with exterior painting isn't always easy, this job is no exception. Some of the worst ( & largest) barge boards I've ever worked with needed some serious attention. Just to put the size into perspective, the largest length spanned over 3 lifts of scaffolding, meaning it had to be completed in 3 seperate sections, & all look uniform. I also had a window that was falong to bits & a cellar door that had seen better days. I still have a few downpipes to paint and a garage door, which I'll be returning to do soon.