MJ Troup Plant Hire & Groundworks

MJ Troup Plant Hire & Groundworks We cater for all your groundwork needs from foundations to completion. We also have excavators and dumpers for self-drive hire.

Thank you to Callington Cornwall Directory for listing us on their website at
http://callingtonareabusinesses.weebly.com/p.html

01/05/2023

A massive thank you to MJ Troup Plant Hire & Groundworks for sponsoring the U9 Golds rain coats πŸ‘πŸΌπŸ–€βš½οΈπŸ’›

02/09/2017

Due to an ever expanding work load we are looking to take on a block/brick layer. Full time position. Full driving license required.
Please apply to [email protected] or ring 07836 653456.

We are pleased to anounce that from January 1st we can offer a full drain jetting and surveying service.Using the state ...
11/12/2015

We are pleased to anounce that from January 1st we can offer a full drain jetting and surveying service.
Using the state of the art 'Dart Eye' drain inspection camera we can complete a full survey of all drains, domestic and comercial, storm and foul.
A full colour film of each drain line can be supplied to the customer on a memory stick, with a written report of any recommended remedial action required.
Blocked drain can be cleared with high pressure jetting.
Phone 07836 653456 for details.

180M of concrete pumped in on Monday morning. Steel fixed and 118m pumped in on Friday. Had enough now. I'm off to Canad...
02/08/2015

180M of concrete pumped in on Monday morning. Steel fixed and 118m pumped in on Friday.
Had enough now. I'm off to Canada. See you soon.

30/07/2015

We have a vacancy for a groundworker. School leaver or apprentice will be considered. Full time. Contact Mat on 07836653456.

SIDE CLADDING UP, INTERNAL DRAINS IN, FLOOR PREPARED, INSULATION LAID, 20 TONNES OR REBAR FIXED IN THE FLOOR AND 200CUBI...
26/07/2015

SIDE CLADDING UP, INTERNAL DRAINS IN, FLOOR PREPARED, INSULATION LAID, 20 TONNES OR REBAR FIXED IN THE FLOOR AND 200CUBIC METERS OF CONCRETE BOOKED FOR TOMORROW MORNING.
JACK TROUP HAS STILL GOT A JOB.

MAY 2015STEEL FRAME FINISHED, ROOF GOING ON AND BEAM FLOORS GOING IN. JACK TROUP REHIRED.
26/07/2015

MAY 2015
STEEL FRAME FINISHED, ROOF GOING ON AND BEAM FLOORS GOING IN. JACK TROUP REHIRED.

Steel frame erected. Re hired Jack Troup after he was fired last week. He's been demoted to painting steel.  Might fire ...
15/04/2015

Steel frame erected.
Re hired Jack Troup after he was fired last week. He's been demoted to painting steel. Might fire him again tomorrow.
Happy days.