25/08/2025
I say every year I will try and be more active on social media yet I seem to get worse!
I don’t know what it is about sharing my work I find difficult but for whatever reason it doesn’t always sit right with me.
I know I should do more as it’s part of the game and the time we live in.
Seeing as my last post was us moving into our first place I will try and post a few projects I’ve done on the house to get started again and hopefully get into the habit of posting again!
So starting with the kitchen… it wasn’t a job I was in a huge rush to do but after booking the flooring to go down I knew it would be a good idea to get it done before.
The ceiling was already finished from when I changed the spotlights and walls were prepped and first coated.
It was tight to spray as I had to close off the living space because that area was already finished and to contain as much heat as possible! (Was Feb)
I got it done over a long weekend, colour is F&B ‘Breakfast Room Green’ mixed in Everal Aqua 40 and a tinted Haftprimer.
Handles were changed to a brass option from as they matched the original size to save on time filling for new handles.
Ceilings in AR2 and walls in ‘Skimming Stone’ matched in Cleanable Matt.
Rad cover was a flat pack MDF job done in matching paints to the kitchen.
Floor was done by who did a wicked job! Thanks mate 👍🏼
Still some boxing in to do above the boiler and we would like to change the worktops, sink etc but that’s a job for another day!
Scroll for the before, feels a much brighter fresher space now!