RAW Mechanical

RAW Mechanical We undertake every aspect of plumbing & heating. Call now to see if we can help you

Another one wrapped up in King’s Cross We’ve just completed the 1st and 2nd fix plumbing package on this Korean bar refu...
10/02/2026

Another one wrapped up in King’s Cross

We’ve just completed the 1st and 2nd fix plumbing package on this Korean bar refurbishment. Small footprint, clean install, smooth delivery from start to finish.

No matter the size of the project, the standard stays the same.

On to the next.

A look back at our pre-Christmas emergency works at Waitrose Monmouth.Following the severe flooding, we supported urgent...
23/01/2026

A look back at our pre-Christmas emergency works at Waitrose Monmouth.
Following the severe flooding, we supported urgent recovery works including refurbishment support and the relocation and installation of damaged refrigeration equipment.
Thanks to a strong team effort and close coordination with all parties, the store was successfully reopened in time for Christmas.
Proud to support critical projects under tight timeframes when it matters most.

Proud to say we completed this project towards the end of last year — a full plant and refrigeration refurbishment, alon...
23/01/2026

Proud to say we completed this project towards the end of last year — a full plant and refrigeration refurbishment, along with the installation of a new bakery and sushi counter.
A great project to be involved in, working alongside a strong team of professionals throughout. Solid collaboration from start to finish.
Thanks to everyone involved — on to the next.

Four months on — project successfully delivered.We’re proud to look back on this project and reflect on what the team at...
23/01/2026

Four months on — project successfully delivered.

We’re proud to look back on this project and reflect on what the team at RAW Mechanical delivered for a high-end client.

Despite a demanding programme and high expectations, the works were completed on time, to a high standard, and fully aligned with the client’s brief from the outset.
This project is a strong example of what can be achieved through clear communication, detailed planning, and a committed site team.

Credit to everyone involved — from early coordination through to final handover ,the level of professionalism and attention to detail throughout was evident.

Projects like this reinforce our continued focus on quality, programme discipline, and building strong, long-term working relationships.

Earlier this year we had the pleasure of joining Smith Brothers Stores on a 4-day golf trip to Portugal 🏌‍♂️A great way ...
15/12/2025

Earlier this year we had the pleasure of joining Smith Brothers Stores on a 4-day golf trip to Portugal 🏌‍♂️

A great way to reflect on an amazing year of completed projects and quality time with the teams from Bristol, Cardiff, and Southampton.

Thanks again for the invite and hospitality — much appreciated.

Big step forward for RAW Mechanical LTDWe’re pleased to share that we’re now fully accredited with: ✅ CHAS ✅ SafeContrac...
12/11/2025

Big step forward for RAW Mechanical LTD

We’re pleased to share that we’re now fully accredited with:

✅ CHAS
✅ SafeContractor
✅ Constructionline
✅ SSIP (Safety Schemes in Procurement)

These accreditations show the standards we work to day in, day out — keeping quality, safety and compliance at the heart of everything we do.

Massive thanks to the whole team for helping make this happen.

The RAW team have been busy.We’ve just installed two new Galletti air-cooled chillers feeding into the AHU – making sure...
20/09/2025

The RAW team have been busy.

We’ve just installed two new Galletti air-cooled chillers feeding into the AHU – making sure the supermarket runs smoothly and stays right on point with temperature control.

Top work from the lads delivering quality pipework and a tidy install.

Project Progress Great to see the momentum building on our multi-floor refurbishment project .Teams are working across m...
10/08/2025

Project Progress

Great to see the momentum building on our multi-floor refurbishment project .

Teams are working across multiple floors simultaneously, coordinating mechanical and plumbing works to keep everything on schedule and to spec. The photos show just some of the progress being made across the site this week.

Every floor tells its own story – from first fix to final touches – and it’s all down to the dedication of the people on the tools.

Another day, another skyline view Proud to be working on 22 Bishopsgate – the 2nd tallest building in London.This week w...
10/08/2025

Another day, another skyline view

Proud to be working on 22 Bishopsgate – the 2nd tallest building in London.

This week we’re replacing FCU valves across 3 floors, with an unbeatable view of The Gherkin. To keep things running smoothly without draining the system, we’re freezing pipework with liquid nitrogen – precision work at height!

🔧 Engineering in one of London’s most iconic buildings isn’t just about the job – it’s about the challenges, the tools, and the views that come with it.

Five Mitsubishi Chillers Delivered & Positioned A major milestone on site this week – five Mitsubishi Electric chillers ...
10/08/2025

Five Mitsubishi Chillers Delivered & Positioned

A major milestone on site this week – five Mitsubishi Electric chillers have arrived, positioned, and are now ready for installation.

Configured as three units in series and another two in series, these will deliver an efficient, flexible cooling solution for the building. All units have been set on Midfix frames, ensuring a secure and level installation platform.

Huge thanks to the team for coordinating delivery, positioning, and getting everything in place safely. Next step – installation and commissioning.

Male & Female Welfare Facilities Completed - Distribution Centre Project.Pleased to share the successful completion of t...
28/07/2025

Male & Female Welfare Facilities Completed - Distribution Centre Project.

Pleased to share the successful completion of the male and female toilet blocks at a major UK supermarket distribution centre.

• Supply and installation of unvented hot water storage cylinder
• Hot and cold pipework to multiple basins and WCs
• Stainless steel urinal troughs with exposed flush pipework
• All works completed in line with programme and project specifications

A clean, practical and durable setup designed for high-usage environments – well done to the team for another smooth delivery.

Project Update We have had a flying start.This 3-floor commercial project includes:🔧 Chilled & heating fan coil units🔧 S...
20/06/2025

Project Update

We have had a flying start.

This 3-floor commercial project includes:

🔧 Chilled & heating fan coil units
🔧 Stainless steel pipework throughout
🔧 Public health & tea point installations
🔧 Full plant room setup with booster set
🔧 Prefabricated risers and pipework package

Big thanks to the team for the strong start 💪

Address

Unit 28 Space Business Centre , Cheltenham , GL519FL
Cheltenham
GL528WY

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+447786513995

Alerts

Be the first to know and let us send you an email when RAW Mechanical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share