02/04/2026
New carport and gates to match π₯
100mm treated timber posts black jacked in a post bracket on a concrete pad under the new block paving β
6x2 treated timber Wall plate chemically fixed and bolted to the flank wall β
6x2 treated Timber rafters supported with joist hangers β
New custom made gates, new hinges, handles and locks β
New Polycarbonate sheets along with all the trims β
New guttering and downpipe β
Block paving all cut around the posts and put back in β
The front cladded β
( ready to match the back in a months time ) π
One happy customer β
Thanks to for the assistance on this one π«‘