21/02/2026
Footings are in and block work has started to go up on this project it’s a tough job with access and bringing materials up and down the 20 metre ramp built from scaffolding by Able scaffolding. With over 200 tonnes of built up ground that had to come out we managed to complete this with the help of C&C grab hire.
Stay tuned for how this one turns out.