22/06/2026
Tasked with delivering fast pressurised hot water along with reliable heating all while working within budget ! We delivered as promised 😀.
We removed the failed boiler, poorly installed cylinder and the now redundant tanks. We installed a Worcester system boiler with a 10 year manufacturers warranty in the utility room and additional expansion in the airing cupboard. We installed a 250ltr Gledhill pressurised hot water cylinder delivering amazing hotwater, we installed two eph zone valves giving total independent control over heating and hotwater. Flushed, commisioned and ready to go. 🛠
Gas Centre
Worcester Bosch Professional
EPH Controls
Spirotech UK
Lawton Copper Tubes