03/04/2026
This was a full rip out and re-model for a customer in Liverton. Ripped out all of the formed shelves around the bath, new ceiling, new flooring, extractor and fully tiled. Got rid of the bath and put in a large shower. I did fit a mirrored unit above the basin, but never took a photo of it. Whoever installed the UPVC ceiling took down the plasterboard, plonkers!
Then did the same to the cloakroom. Particularly chuffed with the cloakroom. There was no room for a basin, so made one recessed into a dodgy looking storage/shelved cupboard. Put a little down light in it and it looks amazing. Fully tiled again.