08/09/2025
Been a busy 3 weeks getting these 2 rooms done. Main bathroom was stripped out and new bath fitted with bespoke storage at the end of the bath created. Tiled shower area, floor and basin splash back. All walls and ceiling plastered. New radiator, mirror and new downlighters fitted. All finished with plastic skirting. En-suite was ripped out and airing cupboard removed to make the room bigger. Old airing cupboard door and frame removed and boarded up. New bigger shower tray fitted along with herringbone tiling. New chevron lvt flooring fitted. All walls plastered. New mirror fitted along with new wc and basin. Splashback also done in herringbone.