27/05/2026
🩵🩵 Some before and after pics, of a recent bathroom refresh completed, after water getting through tiles and damaging enclosure walls.
The tiles, soaked plasterboard, 18mm
ply, tray and shower all stripped out.. then enclosure area dried out with a dehumidifier.
studs added, 1st fix then plaster board re-sheeted, one wall was dot n dabbed, shower base built, tray fitted with fast flow waste, wetwall, towel radiator ,mixer shower and enclosure installed last 🛀