18/10/2024
Before and after ! Designed and installed by ourselves. This bathroom had a full transformation. The bathroom had been flooded, and the whole floor needed to be pulled up as it had all given way. The ceiling was pulled down, and all walls were boarded with a combination of shower board or moisture resistant mdf. The floor was replaced with a structural ply for extra strength. This particular property is steel framed so getting pipes and waste out of the way so the shower tray was on the floor was a challenge but we managed it and now it's a lovely low step into the shower. All plumbing was done with copper and soldered.
We installed a honesty shower, vanity, and a framed toilet. It's created a clean, simple but stunning looking bathroom.
There are plenty of close-up shots to show the finish of the silicon, etc, we do aim for a professional finish on every aspect that is within our control.