MBI FAMILY RUN LOCAL BUISNESS
TRADING 15 YEARS
EXCELENT REFERENCES
ALL HOME IMPROVEMENT WORK CARRIED OUT
EXCEPTIONAL ATTENTION TO DETAIL
FREE ESTIMATES

Latest bathroom makeover. Tight but managed to get a bath and good sized shower in.Original pipe work was a mess with nu...
16/03/2023

Latest bathroom makeover. Tight but managed to get a bath and good sized shower in.Original pipe work was a mess with numerous leaks under the floor. Turned out nice though.

Turned an old tired bathroom into a modern clean lined shower room.
27/07/2022

Turned an old tired bathroom into a modern clean lined shower room.

New design for a open plan kitchen and bathroom 🤦‍♂️
16/06/2022

New design for a open plan kitchen and bathroom 🤦‍♂️

It’s gone from plastering a ceiling and putting some new down lighter’s in to removing 3 layer’s of plaster board and a ...
15/06/2022

It’s gone from plastering a ceiling and putting some new down lighter’s in to removing 3 layer’s of plaster board and a knotty pine ceiling and having to remove all the ceiling joists and the bathroom floor. Don’t you just love s**t plumbers doing a half arsed job and the dreaded woodworm 🤦‍♂️🤦‍♂️

Latest bathroom finished. Took a bit of doing as the room was 3 inches out of square 🤦‍♂️
11/06/2022

Latest bathroom finished. Took a bit of doing as the room was 3 inches out of square 🤦‍♂️

Latest project finished. Started off blocking doorway off in picture one that was a second toilet. Built into bedroom to...
07/02/2022

Latest project finished. Started off blocking doorway off in picture one that was a second toilet. Built into bedroom to create an en-suit. Fitted new walk in shower with rain shower and separate hand held controlled from a diverter valve. New sink/ towel warmer. Built in storage cupboards and tiled walls and floor. Decided to rip out old cupboards either side of old chimney breast and then re boarded ceiling and walls and re-plastered bedroom. Fitted new back moulds and skirting. New cupboards to be fitted at a later date.

Turned a damp very old kitchen into two rooms. First part will provide fridge/freezer area with shelving for provisions....
15/11/2021

Turned a damp very old kitchen into two rooms. First part will provide fridge/freezer area with shelving for provisions. The rear has been turned into a wet room with designer radiators and provision for the washing machine.

This is what happens if you don’t take care of leaks from your shower. Floor boards and joists gone even the wall plate ...
21/09/2021

This is what happens if you don’t take care of leaks from your shower. Floor boards and joists gone even the wall plate has disintegrated. Damp has soaked through brick work so living room wall is stained and under stairs cupboard. Bit of a mess but will put it all back together properly this time.

Opened up this dining room wall to create a kitchen diner. Under tile heating installed and re-scimmed dining room.
20/09/2021

Opened up this dining room wall to create a kitchen diner. Under tile heating installed and re-scimmed dining room.

New porcelain pavers and eco decking has transformed this corner of the garden.
12/07/2021

New porcelain pavers and eco decking has transformed this corner of the garden.

Just another 35 square meters to go down but at least kitchens done.
03/03/2021

Just another 35 square meters to go down but at least kitchens done.

Kitchen is all fitted and tiled. Couple of bits to snag then onto the next bit of the project.
29/01/2021

Kitchen is all fitted and tiled. Couple of bits to snag then onto the next bit of the project.

Address

Hexham
NE463AU

Telephone

+447940929923

Website

Alerts

Be the first to know and let us send you an email when MBI posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share