19/11/2026
On a commercial heat pump system, the primary loop has to be right from day one. At a new Central London aparthotel, two 40kW CAHV-R heat pumps (on lower-GWP R454C) were specified with the primary loop designed in from the outset.
Ltd supplied the CHAV-R heat pumps with JET ancillaries from Pipe Centre.
For the mechanical contractor, that meant one supply route, matched to the design and delivered when needed.
Engineering Ltd’s Snooks says it simplified procurement and helped keep the installation on track.
Designed in, not added on.