23/06/2026
This project started with a tiled floor that needed some serious preparation before the new flooring could go down.
First, we mechanically ground the tiles to create a suitable surface, then applied UltraFloor products to level and prepare the subfloor properly. As always, the preparation stage is what sets the foundation for a long-lasting installation.
Once the floor was perfectly prepared, we fitted the stunning J2 Flooring Iconic Range – Kieder 80 Herringbone, finished with a traditional block border to frame the installation beautifully.
The combination of the herringbone pattern and block border gives this floor a timeless look that really suits the space.
Preparation ✔️
Precision ✔️
Attention to detail ✔️
A floor is only as good as the preparation underneath it, and this project is a perfect example of why we never cut corners.
What do you think of the finish?