12/01/2026
A recent bathroom we did in Holt Park.
This started as fresh plaster, with a lot of prep needed on the woodwork. We spent around an hour on the door and doorframe alone, smoothing the architrave out and the results speak for themselves. We’re here to do things properly, not for a quick fix which will fail later down the line.
We used a full system. We primed it using their 2 in 1 Primer, in white for both the walls and ceiling, then used their Bath & Kitchen in white for the ceilings and Teal 03 for the walls.
The opacity on this product is outstanding.