18/06/2026
Bathroom makeover complete.
Full rip out and rebuild required. Bath out and walk in shower installed. Boxed in the pipes and chimney. Changed the flooring, tiled and painted.
If you want anything doing around the house please let me know. Thanks Paul
PM Handyman Services