SLB joinery

SLB joinery all types of joinery works undertaken

3 new veluxe windows put in
01/09/2022

3 new veluxe windows put in

Handrail replaced
31/08/2022

Handrail replaced

Hall way walls made thicker for bigger door frame with our plastering..m.d.f was used with hidden joints
26/08/2022

Hall way walls made thicker for bigger door frame with our plastering..m.d.f was used with hidden joints

Built in TV and fire
19/08/2022

Built in TV and fire

Bar front made out of mdf
26/07/2022

Bar front made out of mdf

On going work at one of my jobs..frames..doors..floor..panelling
04/07/2022

On going work at one of my jobs..frames..doors..floor..panelling

Paneling in hall..stairs..landing
25/06/2022

Paneling in hall..stairs..landing

Decking with roof and cover on 3 sides
21/06/2022

Decking with roof and cover on 3 sides

Fence replaced
09/06/2022

Fence replaced

Fence round bins
06/06/2022

Fence round bins

Old Fence replaced
31/05/2022

Old Fence replaced

Address

Lisburn
BT281

Website

Alerts

Be the first to know and let us send you an email when SLB joinery posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share