27/11/2022
Beautiful MC installation on a kitchen in Chelmsford Essex, clients did not want pour in situ or precast concrete as time was a huge factor so needed an alternative that could mimic the finish that was required.
Client wanted an asteroid like finish while still being modern and industrial
Base boards were mdf 18mm sandwiched together to create 36mm base boards
Boards were all glued, screwed and filled with 2 part filler
Worktop surfaces were then primed with primer RR before base coat was applied
Technique used was our own design pioneered for our sculptures that we created for a hotel a while back
Beautiful splashback to complement in slightly different texture to differentiate the 2 surfaces