RDS London Ductwork Services

RDS London Ductwork Services Manufacturers and Installers of Sheet Metal Ductwork, Fire Rated Ductwork, PVC Ductwork & Air Conditioning.

A big thank you to Designer Group for inviting RDS along to their annual Charity Golf Day in support of Lennox Children'...
10/06/2026

A big thank you to Designer Group for inviting RDS along to their annual Charity Golf Day in support of Lennox Children's Cancer Fund. ⛳

A great day out for a brilliant cause, and even better that Steve and Callum came away as part of the winning team.

Always good to get out from behind the desk and support events like this. Thanks again to Designer Group for having us!

Huge congratulations to Stephen George Hinds, who has been awarded a Green Card Certificate by SES for outstanding H&S p...
05/06/2026

Huge congratulations to Stephen George Hinds, who has been awarded a Green Card Certificate by SES for outstanding H&S performance on site.

The award recognises Stephen's awareness around working at height, use of correct access equipment, and his willingness to intervene when observing others' working practices. That last point matters. Spotting a risk and saying something takes confidence and it is exactly the kind of behaviour that keeps people safe.

Well done Stephen. A deserved recognition and a proud moment for the RDS team.

Thirty High. 220 Blackfriars. 7 Millbank. Three complex ductwork packages RDS has delivered simultaneously, across centr...
03/06/2026

Thirty High. 220 Blackfriars. 7 Millbank. Three complex ductwork packages RDS has delivered simultaneously, across central London, for some of the most exacting clients in the sector.

Exposed ductwork. Fire-rated systems. Tight programmes. High specification from basement to roof.

More updates to come. Follow RDS Projects to stay across what the team are working on.

Price gets you in the room. Track record keeps you there.The majority of our work comes from clients who have used RDS b...
29/05/2026

Price gets you in the room. Track record keeps you there.

The majority of our work comes from clients who have used RDS before. Main contractors who know what to expect from RDS. Who trust the installation will be right and the sign-off process will not become a problem.

That kind of reputation takes years to build. It does not come from one well-delivered project. It comes from being consistent enough, across many jobs, that the reappointment of RDS stops being a question.

It is the thing that rarely shows up on a tender form but tends to matter most when a client is deciding who to trust with a complex ductwork package.

You've probably walked past an RDS project without knowing it.The office buildings, the residential towers, the mixed-us...
28/05/2026

You've probably walked past an RDS project without knowing it.

The office buildings, the residential towers, the mixed-use schemes across central London and beyond. The ductwork keeping the air moving, the fire-rated systems protecting the structure, the ventilation serving every floor, installed by a specialist contractor that most people have never heard of.

That's fine by us. The work is in the buildings. That's where it should be.

Visit rdsprojects.co.uk to see more of what we do.

You wouldn't run a marathon without training, so why would you start a job without the right preparation in place?Before...
22/05/2026

You wouldn't run a marathon without training, so why would you start a job without the right preparation in place?

Before a single piece of ductwork arrives on site at Milbank, the team had already mapped the programme. Labour confirmed. Materials ordered. Delivery slots booked. Storage organised. A five-week manufacturing lead time for the fire-rated systems planned in from the beginning.

Because a job that starts right stays right. When something unexpected comes up mid-programme, the teams who prepared can respond. The ones who didn't lose time they can't get back.

Nine weeks of pre-start planning. That's what it takes to hit a completion date on a project of this size.

22 storeys. 220,000 sq ft of Grade A office space. Exposed ductwork on every floor. And a two-week window to complete fi...
18/05/2026

22 storeys. 220,000 sq ft of Grade A office space. Exposed ductwork on every floor. And a two-week window to complete first fix on each level.

220 Blackfriars is one of the most logistically demanding projects RDS has delivered. The programme does not move. That means manufacturing has to be right, deliveries have to land on time, and the install teams have to be ready from day one on every floor.

Each level has two dedicated plantrooms, allowing easy split between separate tenancies. Below ground, two basement levels of landlord plant, cycle stores and shower facilities, all served by a mixed-use ventilation and smoke extract system to EN 1366. At ground level, a large reception and future retail space.

Complex programme. High specification. Right in the heart of London.

Nine weeks before boots hit site. That's how early our team started planning the Millbank project.Estimating, CAD, opera...
15/05/2026

Nine weeks before boots hit site. That's how early our team started planning the Millbank project.

Estimating, CAD, operations, commercial, all in a room together. A five-week manufacturing window for the fire-rated systems built into the programme from the start.

That preparation is what keeps a job on programme. It's what lets the team absorb problems when they come up, because the right people have already thought them through.

It doesn't happen by accident. It happens because the whole office pulls together before anyone sets foot on site.

14/05/2026

A 1960s building, 30 storeys, over 24 risers and ductwork left fully exposed on every occupied floor.

When the services are on show, there's nowhere to hide. Every run, every joint, every bracket has to be right. Not near enough. Right.

RDS are delivering the full ductwork package at Thirty High Victoria, working through an existing structure that doesn't bend to a modern services layout. Flat oval on the CAT A floors. Fire-rated systems in the core. Basement plantrooms, roof-level plant, a double-height reception pavilion, and a full shower facility at basement level.

Challenging structure. High specification. The kind of project RDS does well.

Address

Contract House, Unit 1a Bates Industrial Estate
London
RM30HU

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when RDS London Ductwork Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RDS London Ductwork Services:

Featured

Share