24/04/2019
Victorian geometric hallway, major restoration,
Lee Crescent
Edgbaston
Birmingham
This fine hallway was all but lost due to flood damage, the section unaffected by water ingress required light restoration whilst an entire 4 meter area of major damage required excavating, the sub base replacing, screeding and a new section of Geometric tiling installing. I used as many reclaimed tiles as possible. Virtually all the reproduction tiles are hand cut, the floor had a very unusual geometry due to the shape of the building.