31/05/2021
Month 2 draws to a close and it’s been another busy one, the recent high winds resulted in a couple of fence panel replacements, a summer house needed a makeover with a fresh coat of stain, a complete redecoration including the challenge of a 5.5 metre high vaulted ceiling, new vinyl flooring in a kitchen area, fitting Velux window blinds, repairing a chipped bath and numerous other jobs too.
Certainly getting a variety and never a dull moment!