123 Plumb

123 Plumb We offer a range of services at competitive prices that reflect our exceptional workmanship. Whether

13/03/2026

Two stunning bathroom installations by 123 Plumb👌🏼

Statement finishes, sharp mitred detailing, warm feature lighting and sleek brass accents come together to create a truly luxury space.
Clean lines. Premium craftsmanship. Flawless ex*****on.

Half Term is always busy!Fantastic and long term client of ours Tubbenden Primary SchoolProject Scope:- Upgrading Hot & ...
23/04/2025

Half Term is always busy!

Fantastic and long term client of ours Tubbenden Primary School

Project Scope:

- Upgrading Hot & Cold Domestic pipework throughout the school.
- New Heating & Radiators throughout.
- Mains booster and slave tank.

The future of residential heating? ⛔ Goodbye gas. 🚫 Goodbye hydrogen. 🌍 Hello heat pumps. The Climate Change Committee’s...
15/04/2025

The future of residential heating?

⛔ Goodbye gas.
🚫 Goodbye hydrogen.
🌍 Hello heat pumps.

The Climate Change Committee’s Seventh Carbon Budget report makes it clear: around half of UK homes need to be heated by heat pumps by 2040 to reach the UK’s 2050 net zero target!

As heat pumps reduce carbon emissions by at least 75% which rises to 100% with renewable energy, it’s no surprise that this technology is critical to decarbonising our homes and the UK.

Not only do heat pumps benefit the environment, but they also save people money on their heating costs, add value to homes and provide a constant, comfortable indoor temperature. It’s a no brainer.

At 123 Plumb, we know this transition cannot be done alone and there is much to be done to drive the transition forward at scale.

✅ Now is the time to start planning for the switch over from Gas Boilers.
✅ Now is the time to save on your energy bills.
✅ Now is the time to reduce CO2 emissions.

You can save £7500 off your install of a Heat Pump with 123 Plumb. In addition to that we guarantee a minimum heating system performance and offer a 7 year manufacturers warranty through Vaillant UK advanced installers programme.

Find out more about the Boiler Upgrade Scheme here: https://www.ofgem.gov.uk/environmental-and-social-schemes/boiler-upgrade-scheme-bus #:~:text=Financial%20years%202022%20to%202025,budget%20to%20£205%20million.

Visit our website to find out how we can support you: https://www.123plumb.co.uk

                         

🌟Brittains Lane, Sevenoaks 🌟The Duck is back!Here we have a project we completed some time ago and posting about it had ...
15/04/2025

🌟Brittains Lane, Sevenoaks 🌟

The Duck is back!

Here we have a project we completed some time ago and posting about it had slipped through the net. This was on behalf our long term Client .k.perry_building_services who made easy work of creating this dream renovation for the customer.

Our Scope of Works:
* Fully house replumb and system Design
* Condensing Gas boiler with multi zone control
* Underfloor heating to Ground floor
* Radiators to 1st floor
* 4x bathrooms
* Water Softener, secondary return and much more

🌟Wilderness Road, Chislehurst Complete🌟 The existing boilers had broken down and nearing the end of their serviceable li...
11/04/2025

🌟Wilderness Road, Chislehurst Complete🌟

The existing boilers had broken down and nearing the end of their serviceable life. We had some time to plan and prepare for the upgrade which meant it could be well thought out and a speedy install limiting down time to less 24 hours for our client.

•2x new 64Kw .uk ecotec plus boilers
•New flues
•Replacement plate heat exchanger
•System Pump

Another Heat Pump Handover Pack going out today. 👍It’s obviously a MCS requirement that you provide the client with an M...
10/04/2025

Another Heat Pump Handover Pack going out today. 👍

It’s obviously a MCS requirement that you provide the client with an MCS certificate, Part P building notification and filling out the benchmark. We like to put it all in a nice folder for them to keep everything together.

It’s the small things..                             .uk

Cambridge ECO retrofit project is still ongoing 👷‍♂️Our team have been working hard completing Combi boiler to .uk  Heat...
07/04/2025

Cambridge ECO retrofit project is still ongoing 👷‍♂️

Our team have been working hard completing Combi boiler to .uk Heat Pump conversions here since November. With a mixture of Heat pump cylinders and to take care of the DHW demand.

More to follow on this project as the Fabric Upgrades continue to each home which includes Solar, New Windows and doors, new roof insulation, solid wall insulation and Radiator upgrades.

                         

✅ Bathroom Completed 😍 Perfectly chosen scheme here by our lovely client. Project started with a full strip out and buil...
04/04/2025

✅ Bathroom Completed 😍
Perfectly chosen scheme here by our lovely client. Project started with a full strip out and built the room from scratch to insure it’s all under guarantee and lasts the rest of time! Cast Iron bath out, wet room tray in and bathroom tanked to prevent any possibility of water ingress. 15 days from start to finish 🙌

Darrick Wood Junior School 👷‍♂️Site set up for our school water upgrade project. It’s always important you start as you ...
03/04/2025

Darrick Wood Junior School 👷‍♂️

Site set up for our school water upgrade project. It’s always important you start as you mean to go on. Making the little extra effort at the start not only looks good but it keeps progress running smoothly.

Project Scope:

- Upgrading Hot & Cold Domestic pipework through the school.
- New mains dig and pipework to school.
- Mains booster set and slave tank.
- New HW Calorifiers.
- Plant room controls overhauled and new BMS system with head end. Designed, built and installed.
-Upgraded taps and toilet fill valves.

Project Completed 👷‍♂️Marsh HouseNew Build annexe for a domestic customer. Beautiful cladding as a backdrop against the ...
02/04/2025

Project Completed 👷‍♂️

Marsh House
New Build annexe for a domestic customer. Beautiful cladding as a backdrop against the equally pleasing on the eye .uk Arotherm plus 3.5kw heat pump.

This project was eligible for the the Boiler Upgrade Scheme (BUS) Grant meaning our customer saved £7500 off installation!

Get in touch for further details.. ♻️

🌟Trustmark Registered🌟 We are now part of Trustmark which is the only Government Endorsed Quality Scheme in the UK. Prov...
31/03/2025

🌟Trustmark Registered🌟 We are now part of Trustmark which is the only Government Endorsed Quality Scheme in the UK. Proving our commitment to the standard of the service we provide to our customers!

Address

Unit 15, Quarry Wood Industrial Estate, 17 Lake Rd, Aylesford
Maidstone
ME207TQ

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4pm
Wednesday 8am - 4pm
Thursday 8am - 4pm
Friday 8am - 4pm

Alerts

Be the first to know and let us send you an email when 123 Plumb posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share