02/05/2026
From outdated cobbles to a smooth, durable finish. đ§â¨
Nothing beats the satisfaction of a total site transformation. We recently took on this project to replace a worn-out, uneven cobblestone access with a high-quality sma surface.
The Process:
1. Full Excavation: Stripping back the old, damaged cobbles to create a clean slate.
2. Ground Preparation: Precision leveling of kerbs, good compaction of the sub-base to ensure a solid, long-lasting foundation.
3. Drainage & Ironwork: Replacement of 6 manhole covers and 2 gullies to ensuring proper water runoff.
4. The Finish: Laying and rolling of 60mm binder and 40mm SMA 10 surface course for a durable long lasting pavement.
The result? A safer, more accessible, and visually improved space that is built to last.
A huge shoutout to Harryâs crew for their hard work on the tools. Itâs all about the attention to detail from the first dig to the final roll.
Looking to upgrade your commercial or residential surfacing? Letâs get to work.
Contact us on 01189 767550 or email into [email protected]