๐ก Window Reveal Repairs & Plastering
Following the installation of new windows, there was a 50mm gap around the full perimeter that required making good.
For this project, I chose to:
* Dot and dab 9.5mm plasterboard into the 50mm gaps
* Apply scrim tape to all joints
* Plaster around each window reveal, feathering seamlessly into the existing plasterwork
This type of work is far more intricate than it may first appear. It requires time, patience, and a steady hand, especially when working around expensive aluminium window frames that need protecting throughout the process.
The job was completed to a high standard, with all surrounding areas left clean and tidy. The windows were carefully protected throughout, leaving the frames unmarked and fully cleaned down on completion.
Quality preparation and attention to detail make all the difference to the finished result.