02/03/2026
Another bathroom face lift, customer wanted a remodel on their bathroom, toilet and a new front door.
Bathroom complete rip out and re installation, optimising the space as they have a little one so needed the bath, but also wanted to increase the shower size.
Downstairs toilet just needed a little extra so we replaced carpet tiles with ceramic tiles and had a new toilet and vanity installed, they struggled with space where the door used to swing inwards so we changed it to swing outwards to make it less cramped.
Then a last minute addition whilst there there front door became very hard to open and shut due to a wooden frame and they wanted to change to a UPVC door.
As always shout out to Sealant Sam for all the sealent works.