13/11/2022
Felbridge, West Sussex, Old failed lead gutter stripped out. Timber decking and bearers replaced with new falls and at a higher level to create a wider gutter. Rafters and plate treated with wood preservative. New OSB3 TG4 decking with grp flat trim lay boards. Covered in dark grey FlexiTec 20/20 with 450mg matting. Felt and batten relayed over layboard then peg tiles refitted.