19/01/2025
1st room at our house renovation on elworth street nearly done just need to paint cupboard doors and get some blinds.
floor packed to level as it was 5 inches out of level same as the ceiling, damp proofed all walls and plastered it, made a ceiling feature for leds and fitted the herring bone flooring, exposed brickwork and built in bedside cupboards very happy with results.
If anyone is looking for reliable plasterer get in touch
Thanks