28/10/2026
This week, it was a bathroom refurbishment. The removal of the old bathroom suite, flooring, 2 radiators and tiles.
The customer wanted a walk-in shower rather than the bath for easy access. The replacement sink and toilet were installed too. The customer requested that we use panelling rather than tiles, I think you will agree that this has brightened the bathroom up.
Challenging point was the arm for the shower screen that had to be specially ordered as it needed to be a ceiling connection due to the window placement.