JDC Plumbing+Tiling

JDC Plumbing+Tiling Bathroom installation, general tiling, general plumbing and kitchen installations.

Huge transformation on this downstairs shower room! Tight for space as we've maximised the suite items as much as possib...
10/04/2026

Huge transformation on this downstairs shower room! Tight for space as we've maximised the suite items as much as possible in this room.

All previous pipework was exposed, coming out the concrete floor and exposed on the walls. All pipework is now buried, room skimmed, stud wall built to allow for niche and concealed shower valve.

Bota scudo basin unit, rimless BTW toilet, 1700x800 shower tray, fluted glass with return panel, 2 way concealed shower with fixed head and riser outlet.

All brushed brass finish, patterned tiles wrapping in the corners, fluted tiles on the outside of the shower area.

New ceiling fan, x2 led spotlights lights and a wireless kinetic charging switch.

Please do not hesitate to get intouch for your free quote. Availability for late june into july 😊

JUNGLE WETROOM! Beautiful floral tiles on the wall, wrapped so the pattern continues through the corners.Green/grey floo...
20/03/2026

JUNGLE WETROOM!
Beautiful floral tiles on the wall, wrapped so the pattern continues through the corners.
Green/grey floor tiles.
White 50mmx500mm tiles everywhere else.
Black wall hung toilet.
Black fluted wall hung furniture
Black panneled shower glass
Black 2 way shower valve with handset and ceiling shower head
Inline extractor fan
Underfloorheating cable laid into anti fracture matting, thermal boards fitted before hand.
Really high spec job. Done in 14 days. Lots of work has gone into this and there is during and before photos on this feed.

Check the videos out on our tik tok.

Availability for late june 😊

Customers had started the rip out on this one and had found the plasterboard had been badly damaged and was pulling away...
28/02/2026

Customers had started the rip out on this one and had found the plasterboard had been badly damaged and was pulling away with the tiles. The remainder of boards were removed and replaced with waterproof tile backer board.

New larger low level shower tray.
Shower panels.
Black mixer shower.
Black offset shower enclosure.
Black towel rail.
Freestanding unit.
New lvt oak flooring.

Just awaiting the bowl basin as this wasn't delivered on time.

Big wet room starting next week can't wait to get stuck in!

Availability for late may into june.

Ensuite finished in billinghay. Alot of prep work for this one as all the drainage was above floor level, this all had t...
07/02/2026

Ensuite finished in billinghay.

Alot of prep work for this one as all the drainage was above floor level, this all had to be put below the floor to have a low level shower tray. Dwarf wall had to be partially removed to access the soil pipe.

900x900 shower tray
Cool touch mixer shower
Wall hung vanity unit with drawers
Flat panel towel rail
Rimless close coupled toilet
Double niche
Polished black gloss porcelain tiles, black grout, black trims and black silicone.
Lvt plank flooring.

Very happy customers who looked after me very well 😊 before photos at the end of the feed, installation availability for may.

A bathroom finished yesterday in north hykeham. This is a beautiful transformation, this bathroom has a new lease of lif...
24/01/2026

A bathroom finished yesterday in north hykeham.

This is a beautiful transformation, this bathroom has a new lease of life. The bath was removed, a full length shower tray fitted, a combination basin and toilet unit, black fixtures throughout.
Oak Herringbone lvt flooring.
Beige tiles, colour matched grout and silicone, black tile trim.
Inline Extractor fan
Dual fuel towel rail.
NS Electrical

Before photos at the end of the feed.

Don't hesitate to get in touch for your free estimate!

Little kitchen tile from the other day. Metro tiles, chrome trims, ice grey grout. Availability for early may time. I do...
15/01/2026

Little kitchen tile from the other day. Metro tiles, chrome trims, ice grey grout.

Availability for early may time.

I do have another fitting team, if you would like any work done sooner. Thanks

12/01/2026

Well the new year has started with a bang! Finished a small wc room last week, onto a kitchen tile today and tomorrow, then thursday the first bathroom of the year starts.

We have installation availability for lat april onwards. Thanks

Well thats the last job of the year completed. (friday) this ensuite given a new lease of life, half height tiling outsd...
21/12/2025

Well thats the last job of the year completed. (friday) this ensuite given a new lease of life, half height tiling outsdie the shower area. Vanity basin drawer unit, slightly larger shower tray fitted low level, new enclosure and mixer shower, built in niche, original toilet and rad refitted, lvt flooring.

We will be doing our review draw on new year's eve where one lucky person who has left a review will win £100.

Thank you to all our customers new and old

Massive thanks to 2 tradesmean that have helped out alot throughout this year! Here's to another year! And let's see what we can build next. Guy Beck NS Electrical

Merry christmas and a happy new year to everyone.

Lots of love from the JDC Family!

One we completed yesterday! Moved the locations around a bit on this job,  a wall had partially been removed during the ...
11/12/2025

One we completed yesterday!
Moved the locations around a bit on this job, a wall had partially been removed during the last fit of this bathroom, we've removed it all and completely transformed this space!

1400x800 shower tray
Wet room glass
Dual head mixer shower. On a shower pump.
Combination toilet and basin unit for lots of storage and a clean finish
Feature wall tiling
Garden white wall tiles everywhere else
1200x500 towel rail
Lvt flooring
Fully plastered
5 new led spotlights
Inline extractor fan
Pull cord changed to a chrome switch
Door way blocked up and re skimmed

12 days start to finish.

Thankyou Guy Beck and NS Electrical for your hard work on this job.

Very happy customers.

Installation availability is late March so please dont hesitate to get in touch for your free estimate.😀

Before photos at the end of the feed.

Stunning job finished up today!Marble effect 600x600 tilesBlack tile trimWalnut slatted panelsX2 heated towel railsWall ...
12/11/2025

Stunning job finished up today!
Marble effect 600x600 tiles
Black tile trim
Walnut slatted panels
X2 heated towel rails
Wall hung vanity unit with 2 large drawers and 2 small drawers inside
Led mirror with demister
Low level slate effect shower tray fitted
Black shower controls and shower heads
Blacked panelled shower screen
Lights and fan on a motion sensor as you enter.

What a pleasure it was doing this job for a wonderful couple who looked after me and the workers amazingly.

We have installation availability late Feb into March!

During and before photos at the end of the feed.

Guy Beck thanks for your help once again!

One from this week!Cast iron bath out, low level shower tray fitted!Walk in enclosure with flipper panel.Electric shower...
24/10/2025

One from this week!
Cast iron bath out, low level shower tray fitted!
Walk in enclosure with flipper panel.
Electric shower with diverter rain fall head.
Wall hung vanity unit.
Short projection close coupled toilet.
New radiator, mirror, grab rails and shower basket.
Lvt flooring

Fully tiled with 600x300 marble effect ceramic tiles finished with moon white grout.

Before photos at the end of the feed.

Availability for mid jan onwards.

Address

South Hykeham
LN69LG

Alerts

Be the first to know and let us send you an email when JDC Plumbing+Tiling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JDC Plumbing+Tiling:

Share