WrightMark Bathrooms Ltd

WrightMark Bathrooms Ltd Quality , reliable honest bathroom fitting company with over 20 years in the industry

A few issues on this one but not as bad as some in recent times. A lot of time on the tray cuts but look amazing once gr...
10/02/2020

A few issues on this one but not as bad as some in recent times. A lot of time on the tray cuts but look amazing once grouted. This is the 5th bathroom carried out for this customer as a recent house move meant that they couldn’t wait to see me again for 2 weeks!

When someone leaves this as disabled access and you have to sort someone else’s poor workmanship  to make the customers ...
24/01/2020

When someone leaves this as disabled access and you have to sort someone else’s poor workmanship to make the customers life just a little easier. Screeded floor ready for vinyl , fully tiled walls , pipework run from airing cupboard to the extension hot , cold and heating and the fitting of two radiators and a towel rail. Ready to be completed once screed has dried and floor covering fitted.

En-suite shower room with thought in mind for disability in the future. Raised height WC , wall hung basin and tray as l...
10/01/2020

En-suite shower room with thought in mind for disability in the future. Raised height WC , wall hung basin and tray as low as possible. Awaiting custom mirror and decoration by others.

Massive project in upper Shirley took a little under 4 weeks! Complete move around of all utility’s. Floor strengthening...
20/12/2019

Massive project in upper Shirley took a little under 4 weeks! Complete move around of all utility’s. Floor strengthening , step rebuilding , complete skim , new cylinder 75 gallon roof tank all associated pipework , 3 bar universal pump , complete exterior waste replacement and underfloor heating!!!!

A first in my career triple tiles! And a stud wall on fresh air and a very poorly repair floor leaving the stud wall uns...
21/11/2019

A first in my career triple tiles! And a stud wall on fresh air and a very poorly repair floor leaving the stud wall unsupported. 2 days of works required before the rebuild could take place.

3rd storey flat hiding o few horrors!!!
13/10/2019

3rd storey flat hiding o few horrors!!!

Custom fitted mirror finally installed.
26/09/2019

Custom fitted mirror finally installed.

Partial garage conversion made into shower room , partial utility area and cloakroom all inspected and checked by buildi...
26/09/2019

Partial garage conversion made into shower room , partial utility area and cloakroom all inspected and checked by building control in stages.

Just awaiting the custom templates mirror for mr and Mrs b in Crampmoor. Complete strip out back to floor joists and stu...
31/08/2019

Just awaiting the custom templates mirror for mr and Mrs b in Crampmoor. Complete strip out back to floor joists and stud walls dimmable strip lights really make the recess and can also be used for mood lighting whilst in the bath.

Massive project completed in chandlers ford coming in at 3 1/2 weeks!
08/08/2019

Massive project completed in chandlers ford coming in at 3 1/2 weeks!

Address

Old Redbridge
Southampton
SO15

Alerts

Be the first to know and let us send you an email when WrightMark Bathrooms Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to WrightMark Bathrooms Ltd:

Share