02/04/2020
Heres the last kitchen we completed in wilmslow before the covid 19 lockdown.
Works completed.
-Rip out old kitchen and tiles (floor and wall)
-Supply and fit kitchen
-tile floor
We are still waiting on some made to measure doors (where missing)
-the doors still have protective film on as the painter was following us in