D Reynolds Fencing Contractors

D Reynolds Fencing Contractors fencing Contractors

Another 900 metres done and resetting a water trough - another happy customer!πŸ‘πŸ‘
12/04/2026

Another 900 metres done and resetting a water trough - another happy customer!πŸ‘πŸ‘

Before and after pictures - Pulled out the old wooden fence and replaced it with composite panels, metal posts with plas...
25/03/2026

Before and after pictures - Pulled out the old wooden fence and replaced it with composite panels, metal posts with plastic trims to make 6 bays. Low maintenance and no painting and happy customer πŸ‘

Pulling out old post and rail, replacing with 100 metres of horse mesh and replacing what was a stile with a new metal k...
05/02/2026

Pulling out old post and rail, replacing with 100 metres of horse mesh and replacing what was a stile with a new metal kissing gate.

We would like to wish all our customers past and present a Happy New YearπŸ‘
01/01/2026

We would like to wish all our customers past and present a Happy New YearπŸ‘

24/12/2025
Another 700 metres of barbed wire and sheep πŸ‘  netting with a set of double gates  and  a single gate put up πŸ‘
23/12/2025

Another 700 metres of barbed wire and sheep πŸ‘ netting with a set of double gates and a single gate put up πŸ‘

Security fencing and gates put up with two 15ft 6ft high full galvanised mesh gates with locking drop bolts.  One 12ft m...
20/11/2025

Security fencing and gates put up with two 15ft 6ft high full galvanised mesh gates with locking drop bolts. One 12ft mesh gate to split the car park from storage area in a secure compound. Ground work by Adam Ad Kimberley.

100 metres Post and rail fencing 3 rail high and a  12ft wooden  gate with 2 8x8 gate posts  another happy customer
09/10/2025

100 metres Post and rail fencing 3 rail high and a 12ft wooden gate with 2 8x8 gate posts another happy customer

Another new entrance completed with 15ft fully mesh galvanised gate and post and rail both sides with sheep netting in b...
07/10/2025

Another new entrance completed with 15ft fully mesh galvanised gate and post and rail both sides with sheep netting in between. Stonework completed by Ad Kimberley

900 metres of sheep netting and two runs of barbed wire, 400 metres of twin runs ready for hedge planting in November
04/09/2025

900 metres of sheep netting and two runs of barbed wire, 400 metres of twin runs ready for hedge planting in November

New driveway put in by Adam kimberley  then a post and rail fence around the entrance with a 14ft  full mesh galvanised ...
10/08/2025

New driveway put in by Adam kimberley then a post and rail fence around the entrance with a 14ft full mesh galvanised gate made to order. A very happy customer πŸ‘

Stripped out and rebuilt a manege with post and rail fencing with a new 12ft wooden gate
29/07/2025

Stripped out and rebuilt
a manege with post and rail fencing with a new 12ft wooden gate

Address

Stoke-on-Trent

Telephone

07940095342

Website

Alerts

Be the first to know and let us send you an email when D Reynolds Fencing Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share